0009474: Standard tasks can last longer than the standard phase they belong to.
You can create standard tasks that are longer than the standard phase they belong to. I can't think of a reason why this would be useful.


Project and Service Management > Setup > Project Type
Select Standard phase - set standard duration to e.g 3 days.
Save
Select Standard task - set standard task to longer than the phase duration, e.g. 7 days.
Save
If the ability to make tasks longer than phases is still required, perhaps add a checkbox to automatically calculate phase length based on task length? If it's not a valid scenario to have tasks that are longer than phases, the phase should recalculate when the task length changes, perhaps with a warning message to notify the user what has happened.

Or, as a minimum, display a warning when a task is longer than its phase.
No tags attached.
blocks feature request 0000502 acknowledged rmorley Projects enhancements 
Issue History
2009-06-15 13:10rachelJohnstonNew Issue
2009-06-15 13:10rachelJohnstonAssigned To => rafaroda
2009-06-17 10:34rafarodaRelationship addedblocks 0000502
2009-06-17 10:35rafarodaAssigned Torafaroda => pjuvara
2011-02-04 09:14jpabloaeAssigned Topjuvara => rmorley

There are no notes attached to this issue.