Openbravo Issue Tracking System - Openbravo ERP |
View Issue Details |
|
ID | Project | Category | View Status | Date Submitted | Last Update |
0000542 | Openbravo ERP | E. Translation | public | 2008-06-03 18:03 | 2008-08-19 15:44 |
|
Reporter | RenateNieuwkoop | |
Assigned To | roklenardic | |
Priority | urgent | Severity | minor | Reproducibility | always |
Status | closed | Resolution | fixed | |
Platform | | OS | 5 | OS Version | |
Product Version | 2.35 | |
Target Version | 2.40 | Fixed in Version | 2.40alpha-r3 | |
Merge Request Status | |
Review Assigned To | |
OBNetwork customer | No |
Web browser | |
Modules | Core |
Support ticket | |
Regression level | |
Regression date | |
Regression introduced in release | |
Regression introduced by commit | |
Triggers an Emergency Pack | No |
|
Summary | 0000542: Relabel 'Lead Time' to "Safety Lead Time" |
Description | Screen:
Master Data Management || Product || Product >> Purchasing
The field on the screen currently called 'Lead Time' is not correctly describing the functionality of the field.
The correct term is "Safety Lead Time", defined by APICS as: "an element of time added to normal lead time for the purpose of completing an order in advance of its real need date to protect against fluctuations in lead time. When used, the MRP system, in offsetting for lead time, will plan both order release and order completion for earlier dates than it would otherwise. Syn: protection time." |
Steps To Reproduce | |
Proposed Solution | |
Additional Information | |
Tags | No tags attached. |
Relationships | |
Attached Files | |
|
Issue History |
Date Modified | Username | Field | Change |
2008-06-03 18:03 | RenateNieuwkoop | New Issue | |
2008-06-03 18:03 | RenateNieuwkoop | Assigned To | => cromero |
2008-06-03 18:25 | RenateNieuwkoop | Note Added: 0000430 | |
2008-06-03 18:52 | pjuvara | Priority | normal => urgent |
2008-06-03 18:54 | pjuvara | Note Added: 0000433 | |
2008-06-03 18:56 | RenateNieuwkoop | Note Added: 0000434 | |
2008-06-03 19:07 | pjuvara | Type | @30@ => defect |
2008-06-03 19:54 | cromero | Status | new => scheduled |
2008-06-03 19:54 | cromero | Assigned To | cromero => roklenardic |
2008-06-05 18:48 | RenateNieuwkoop | Note Added: 0000447 | |
2008-06-05 18:55 | pjuvara | Summary | Relabel 'Lead Time' to a more accurate description of what the function of the field is => Relabel 'Lead Time' to "Safety Lead Time" |
2008-06-05 18:55 | pjuvara | Description Updated | |
2008-06-06 16:26 | svnbot | Checkin | |
2008-06-06 16:26 | svnbot | Note Added: 0000452 | |
2008-06-06 16:26 | svnbot | Status | scheduled => resolved |
2008-06-06 16:26 | svnbot | Resolution | open => fixed |
2008-06-06 16:26 | svnbot | svn_revision | => 4880 |
2008-06-11 12:46 | cromero | Target Version | => 2.40 |
2008-06-11 14:33 | cromero | Fixed in Version | => 2.40alpha r3 |
2008-06-19 19:25 | plujan | Status | resolved => closed |
2008-06-27 20:34 | gorkaion | Note Added: 0008047 | |
2008-07-01 17:56 | anonymous | sf_bug_id | 0 => 2007924 |
2008-08-19 13:25 | RenateNieuwkoop | Note Added: 0008618 | |
2008-08-19 15:44 | RenateNieuwkoop | Note Added: 0008622 | |
Notes |
|
(0000430)
|
RenateNieuwkoop
|
2008-06-03 18:25
|
|
The screens that it is used in, is actually (not the screen noted in description):
Material Requirement Planning (MRP) || Transactions || Purchasing Plan || Header
and
Material Requirement Planning (MRP) || Transactions || Manufacturing Plan || Header
I will contact developer to check what the actual function of the field is and where it is used,so we can decide an appropriate label then. |
|
|
|
When changing this label in the product, please also make sure to change the User's Guide and the Functional Documentation. |
|
|
(0000434)
|
RenateNieuwkoop
|
2008-06-03 18:56
|
|
I've sent a mail to Gorka Damian to clarify where this field is being used. |
|
|
(0000447)
|
RenateNieuwkoop
|
2008-06-05 18:48
|
|
Based on the explanation of the field by Gorka and Rok, and as confirmed by Paolo Juvara, the field should be relabelled to:
SAFETY LEAD TIME
thanks
renate |
|
|
(0000452)
|
svnbot
|
2008-06-06 16:26
|
|
Repository: openbravo
Revision: 4880
Author: rlenardic
Date: 2008-06-06 16:26:27 +0200 (Fri, 06 Jun 2008)
- fixed bug 542
- revised help and description of Create Lines From, Copy Lines and Posted buttons
---
U trunk/src-db/database/sourcedata/AD_COLUMN.xml
U trunk/src-db/database/sourcedata/AD_ELEMENT.xml
U trunk/src-db/database/sourcedata/AD_FIELD.xml
U trunk/src-db/database/sourcedata/AD_PROCESS.xml
U trunk/src-db/database/sourcedata/AD_TEXTINTERFACES.xml
---
https://dev.openbravo.com/websvn/openbravo/?rev=4880&sc=1 [^]
|
|
|
|
Updated description of Safety Lead Time on 2.4 User Manual. |
|
|
(0008618)
|
RenateNieuwkoop
|
2008-08-19 13:25
|
|
I checked the 2.40 beta and there is a field labelled stocking lead time.
There is no field labelled 'Purchasing lead time' (bug 541) nor a field called 'safety lead time (bug 542). Please investigate |
|
|
(0008622)
|
RenateNieuwkoop
|
2008-08-19 15:44
|
|
The field is correctly updated in 2.40 beta, sorry for the confusion |
|