Openbravo Issue Tracking System - Retail Modules
View Issue Details
0034118Retail ModulesWeb POSpublic2016-09-28 12:102016-10-25 17:48
daniOpenbravo 
mtaal 
highmajoralways
closedno change required 
3014.04
 
 
No
0034118: [STORE SERVER] Pay open tickets functionality does not work correctly in multiserver (online/offline) using synchronized mode.
Pay open tickets functionality does not work correctly in multiserver (online/offline) using synchronized mode.
Paying 3 tickets (one line each of them) at the same time we can find 2 different problems:
1. Performance is still poor: After both 3 tickets have been synchronized in CS and SS, the screen stays in grey colour for some seconds till the new ticket is shown.
2. Sometimes, a js error is raised and web POS gets blocked (attached file with js error).
Multiserver using synchronized mode (QA environment: CS=52.210.179.85 ; SS=52.210.248.90 ; Web POS=52.210.248.90/openbravo/web/org.openbravo.retail.posterminal/?terminal=21405#login ):
1. Create 3 new tickets at the same time.
2. Menu dropdown: select Pay open tickets.
3. Select both 3 tickets created before and pay them.
4. Realize that those 2 problems can be reproduced:
- Performance is still poor: After both 3 tickets have been synchronized in CS and SS, the screen stays in grey colour for some seconds till the new ticket is shown.
- a js error is raised and web POS gets blocked (attached file with js error).
SER-QA
related to defect 0034292 closed jorge-garcia [BUT Issues: 1861] Pay Open Tickets is slow and UI stalls 
txt jsError.txt (1,341) 2016-09-28 12:10
https://issues.openbravo.com/file_download.php?file_id=9864&type=bug
Issue History
2016-09-28 12:10daniOpenbravoNew Issue
2016-09-28 12:10daniOpenbravoAssigned To => mtaal
2016-09-28 12:10daniOpenbravoFile Added: jsError.txt
2016-09-28 12:10daniOpenbravoResolution time => 1475618400
2016-09-28 12:10daniOpenbravoTriggers an Emergency Pack => No
2016-09-28 12:10daniOpenbravoTag Attached: SER-QA
2016-09-28 12:10daniOpenbravoIssue Monitored: daniOpenbravo
2016-10-25 17:46mtaalRelationship addedrelated to 0034292
2016-10-25 17:48mtaalNote Added: 0090878
2016-10-25 17:48mtaalStatusnew => closed
2016-10-25 17:48mtaalResolutionopen => no change required

Notes
(0090878)
mtaal   
2016-10-25 17:48   
The remaining issue (slow) has been entered as a separate issue assigned to retail.