Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0025832Openbravo ERPA. Platformpublic2014-02-25 16:402014-02-28 19:50
AugustoMauch 
alostale 
immediatemajorhave not tried
closedfixed 
5
 
3.0PR14Q23.0PR14Q2 
AugustoMauch
Core
Production - Confirmed Stable
2013-10-07
https://code.openbravo.com/erp/devel/pi/rev/94d0fb15191969d20c2f89b919bec8a95ad33110 [^]
No
0025832: Problem with the status of process requests
When the grid view is opened after scheduling a process using the form view, the status of the process request is not being handled properly.
- Open the Process Request window
- Create a process and scheduled it in form view.
- Check that the status is updated in the form
- Go back to the grid. Check that the status column is empty for the selected row (wrong), and that the Unschedule or Reschedule button is enabled (right)
- Open that record in form view. Check that the status field is empty for the selected row (wrong), and that the Schedule button is enabled (wrong, the process is already scheduled/complete)
No tags attached.
Issue History
2014-02-25 16:40AugustoMauchNew Issue
2014-02-25 16:40AugustoMauchAssigned To => AugustoMauch
2014-02-25 16:40AugustoMauchModules => Core
2014-02-25 16:40AugustoMauchTriggers an Emergency Pack => No
2014-02-26 13:30alostaleAssigned ToAugustoMauch => alostale
2014-02-26 13:32alostaleReview Assigned To => AugustoMauch
2014-02-26 13:32alostaleRegression level => Production - Confirmed Stable
2014-02-26 13:32alostaleRegression date => 2013-10-07
2014-02-26 13:32alostaleRegression introduced by commit => https://code.openbravo.com/erp/devel/pi/rev/94d0fb15191969d20c2f89b919bec8a95ad33110 [^]
2014-02-26 13:32alostaleNote Added: 0064608
2014-02-26 13:34hgbotCheckin
2014-02-26 13:34hgbotNote Added: 0064609
2014-02-26 13:34hgbotStatusnew => resolved
2014-02-26 13:34hgbotResolutionopen => fixed
2014-02-26 13:34hgbotFixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/5e5fb94fad0b6af9eb1c4b8dc01b1388463caed3 [^]
2014-02-26 13:42AugustoMauchNote Added: 0064610
2014-02-26 13:42AugustoMauchStatusresolved => closed
2014-02-26 13:42AugustoMauchFixed in Version => 3.0MP32
2014-02-28 19:50hudsonbotCheckin
2014-02-28 19:50hudsonbotNote Added: 0064689

Notes
(0064608)
alostale   
2014-02-26 13:32   
Regression introduced in mp29
(0064609)
hgbot   
2014-02-26 13:34   
Repository: erp/devel/pi
Changeset: 5e5fb94fad0b6af9eb1c4b8dc01b1388463caed3
Author: Asier Lostalé <asier.lostale <at> openbravo.com>
Date: Wed Feb 26 13:33:41 2014 +0100
URL: http://code.openbravo.com/erp/devel/pi/rev/5e5fb94fad0b6af9eb1c4b8dc01b1388463caed3 [^]

fixed bug 25832: Problem with the status of process requests

---
M modules/org.openbravo.client.application/web/org.openbravo.client.application/js/toolbar/ob-action-button.js
---
(0064610)
AugustoMauch   
2014-02-26 13:42   
Code reviewed and verified in pi@5e5fb94fad0b
(0064689)
hudsonbot   
2014-02-28 19:50   
A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/2a3305b1338e [^]
Maturity status: Test