Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0002060Openbravo ERP06. Material requirement planning (MRP)public2007-10-08 22:142008-06-12 09:43
pjuvara 
user71 
normalminoralways
closedfixed 
5
 
pi 
No
Core
No
0002060: Incorrect button labels in Manufacturing Plan window
Problem description
===================
In the Manufacturing Plan window the following button labels are incorrect

"Process Work Requirement" should be "Process Work Requirements"

"Process Materials Requisition" should be "Process Material Requisitions".

We should also consider using the verb "Generate" rather than "Process" since the work requirements and material requisitions do not exist before the button is pressed and therefore cannot be processed.

Environment Description
=======================
Openbravo 2.34
demo.openbravo.com

How to Reproduce
================
Navigate to the Manufacturing Plan window.
No tags attached.
Issue History

Notes
(0005649)
user71   
2005-06-01 00:00   
(edited on: 2008-06-12 09:43)
This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1809748 [^]
(0002319)
user71   
2008-05-19 12:07   
(edited on: 2008-06-12 09:22)
Logged In: YES
user_id=1964080
Originator: NO

Fixed since revision 4328 in the trunk.

  - Change processes name

Websvn diff:
https://dev.openbravo.com/websvn/openbravo/?op=comp&compare[]=%2F@4327&compare[]=%2F@4328 [^]