Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0002058Openbravo ERP05. Production managementpublic2007-10-08 21:572008-06-12 09:43
pjuvara 
gorkaion 
normalminoralways
closedfixed 
5
 
2.40alpha-r2 
Core
No
0002058: Incorrect grammar in message
Problem Description
===================
The following message, which appears when you process a work requirement, is incorrect from a grammatical stand point. It also contains a typo (previusly instead of previously) and it uses the wrong terminology (phases instead of operations).

"With this process will be generated the phases and the products from the production plan selected. If the plan is not "explodePhases" type only will be generated the products from the previusly registered phases"

The correct message should be:

"With this process the operations and the products will be generated from the selected production plan. If the plan is not of type "explodePhases", only the products from the previously registered phases will be generated."

Environment Description
=======================
Openbravo 2.34
demo.openbravo.com

How to reproduce
================
Create a work requirement and press Work Requirement Process.

No tags attached.
Issue History

Notes
(0005647)
user71   
2005-06-01 00:00   
(edited on: 2008-06-12 09:43)
This bug was originally reported in SourceForge bug tracker and then migrated to Mantis.

You can see the original bug report in:
https://sourceforge.net/support/tracker.php?aid=1809735 [^]
(0002317)
gorkaion   
2008-05-14 14:09   
(edited on: 2008-06-12 09:22)
Logged In: YES
user_id=1500690
Originator: NO

Changed the messsage of the Work Requirement process to the suggested one.

In trunk revision 4229.