Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0020408Openbravo ERP06. Material requirement planning (MRP)public2012-05-03 16:402012-05-25 12:09
jecharri 
jecharri 
immediatemajoralways
closedfixed 
5
pi 
3.0MP11 
Google Chrome
Core
No
0020408: Manufacturing planning not work with product where safety stock is null or 0
Manufacturing planning does not work with product where safety stock is null or 0.

This product needs to be involved in a process plan.
Run manufacturing plan with this configuraction.
Regression
related to defect 00194363.0MP9 closed jecharri Manufacturing planning does not take into account safety stock as minimum requirement unless there is demand 
depends on backport 0020409 closed jecharri Manufacturing planning not work with product where safety stock is null or 0 
Issue History
2012-05-03 16:40jecharriNew Issue
2012-05-03 16:40jecharriAssigned To => jecharri
2012-05-03 16:40jecharriWeb browser => Google Chrome
2012-05-03 16:40jecharriModules => Core
2012-05-03 16:40jecharriResolution time => 1307484000
2012-05-03 16:40jecharriStatusnew => scheduled
2012-05-03 16:40jecharrifix_in_branch => pi
2012-05-03 17:06hgbotCheckin
2012-05-03 17:06hgbotNote Added: 0048352
2012-05-03 17:06hgbotStatusscheduled => resolved
2012-05-03 17:06hgbotResolutionopen => fixed
2012-05-03 17:06hgbotFixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/8ea1ba7bc3a96f3e0854dc4c70a1cd8cc81d47a7 [^]
2012-05-03 19:08gorkaionNote Added: 0048360
2012-05-04 10:10maiteNote Added: 0048365
2012-05-04 10:10maiteStatusresolved => closed
2012-05-04 10:13jecharriStatusclosed => new
2012-05-04 10:13jecharriResolutionfixed => open
2012-05-04 10:14jecharriRelationship addedrelated to 0019436
2012-05-04 10:14jecharriIssue Monitored: jecharri
2012-05-04 10:14jecharriIssue End Monitor: jecharri
2012-05-04 10:14jecharriStatusnew => scheduled
2012-05-04 10:14jecharriStatusscheduled => resolved
2012-05-04 10:14jecharriResolutionopen => fixed
2012-05-04 10:14jecharriStatusresolved => closed
2012-05-04 10:14jecharriTag Attached: Regression
2012-05-25 12:09hudsonbotCheckin
2012-05-25 12:09hudsonbotNote Added: 0049015

Notes
(0048352)
hgbot   
2012-05-03 17:06   
Repository: erp/devel/pi
Changeset: 8ea1ba7bc3a96f3e0854dc4c70a1cd8cc81d47a7
Author: Javier Etxarri <javier.echarri <at> openbravo.com>
Date: Thu May 03 17:06:19 2012 +0200
URL: http://code.openbravo.com/erp/devel/pi/rev/8ea1ba7bc3a96f3e0854dc4c70a1cd8cc81d47a7 [^]

Fixes issue 20408: Manufacturing planning not work with product where safety stock is null or 0

---
M src-db/database/model/functions/MRP_RUN_INITIALIZE.xml
---
(0048360)
gorkaion   
2012-05-03 19:08   
Code review done. It'd be better if the "tab" is removed on the beginning of the second Mrp_Run_Insertlines.
(0048365)
maite   
2012-05-04 10:10   
verified
(0049015)
hudsonbot   
2012-05-25 12:09   
A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/5401e185a8b0 [^]

Maturity status: Test