0019502: Production Run Status report: Q.Left has to be zero when the phase is closed
In the Production Run tab of the Work Effort you can fill out the quantities you processed and if it's a partial quantity and you know you don't want the rest produced, you should select the 'Close Phase' checkbox.

After processing the work effort, the phase is closed correctly. The quantity that is outstanding is zero at this point, but in the Product Run Status Report, the Q.left is showing the remainder of what has not been produced instead of showing zero.
Enter a work requirement for a certain process plan (just enter a very simple setup). Create the work effort for it and go to the production run tab of the work effort. Enter a completed quantity that is less than the required quantity and select the close phase checkbox.

Run the Production Run Status report to see that the Q.Left is not shown zero
Make sure that Q.Left for closed phases is zero.
OB3 Documentation
png ProductionRunStatusReport.png (45,846) 2012-01-16 12:22
https://issues.openbravo.com/file_download.php?file_id=4907&type=bug
png
Issue History
2012-01-16 12:22RenateNieuwkoopNew Issue
2012-01-16 12:22RenateNieuwkoopAssigned To => jonalegriaesarte
2012-01-16 12:22RenateNieuwkoopFile Added: ProductionRunStatusReport.png
2012-01-16 12:22RenateNieuwkoopModules => Core
2012-01-16 12:23RenateNieuwkoopTag Attached: OB3 Documentation
2012-01-26 08:21jonalegriaesarteTarget Version => 3.0MP10
2012-03-06 12:44jonalegriaesarteAssigned Tojonalegriaesarte => ioritzCia
2012-03-29 16:16jonalegriaesarteNote Added: 0046896
2012-03-29 16:16jonalegriaesarteTarget Version3.0MP10 => 3.0MP11
2012-04-04 09:23hgbotCheckin
2012-04-04 09:23hgbotNote Added: 0047368
2012-04-04 09:23hgbotStatusnew => resolved
2012-04-04 09:23hgbotResolutionopen => fixed
2012-04-04 09:23hgbotFixed in SCM revision => http://code.openbravo.com/erp/devel/pi/rev/3db1b5542465d237efa0512c27446a67c66b4b58 [^]
2012-04-17 05:31hudsonbotCheckin
2012-04-17 05:31hudsonbotNote Added: 0047610
2012-04-27 12:01jecharriNote Added: 0048137
2012-04-27 12:01jecharriStatusresolved => closed
2012-04-27 12:01jecharriFixed in Version => 3.0MP11

Notes
(0046896)
jonalegriaesarte   
2012-03-29 16:16   
Changed to MP11 due to other priorities
(0047368)
hgbot   
2012-04-04 09:23   
Repository: erp/devel/pi
Changeset: 3db1b5542465d237efa0512c27446a67c66b4b58
Author: Ioritz Cia <ioritz.cia <at> openbravo.com>
Date: Mon Apr 02 13:46:05 2012 +0200
URL: http://code.openbravo.com/erp/devel/pi/rev/3db1b5542465d237efa0512c27446a67c66b4b58 [^]

Fixes issue 19502: Production Run Status report.
Q.Left has to be zero when the phase is closed.

---
M src/org/openbravo/erpCommon/ad_reports/ReportProductionRun_data.xsql
---
(0047610)
hudsonbot   
2012-04-17 05:31   
A changeset related to this issue has been promoted main and to the
Central Repository, after passing a series of tests.

Promotion changeset: https://code.openbravo.com/erp/devel/main/rev/cedf57621434 [^]

Maturity status: Test
(0048137)
jecharri   
2012-04-27 12:01   
Verified:
code--> ok
functionality--> ok