Openbravo Issue Tracking System - Openbravo ERP | |||||
View Issue Details | |||||
ID | Project | Category | View Status | Date Submitted | Last Update |
0016849 | Openbravo ERP | B. User interface | public | 2011-04-19 14:02 | 2011-04-19 14:02 |
Reporter | jtarbal | ||||
Assigned To | dbaz | ||||
Priority | normal | Severity | minor | Reproducibility | always |
Status | new | Resolution | open | ||
Platform | OS | 5 | OS Version | ||
Product Version | |||||
Target Version | Fixed in Version | ||||
Merge Request Status | |||||
Review Assigned To | |||||
OBNetwork customer | |||||
Web browser | |||||
Modules | My Openbravo Tab | ||||
Support ticket | |||||
Regression level | |||||
Regression date | |||||
Regression introduced in release | |||||
Regression introduced by commit | |||||
Triggers an Emergency Pack | No | ||||
Summary | 0016849: Ability to schedule the execution of the workspace refresh action | ||||
Description | Currently, the widgets from the workspace can be manually refreshed by either pressing the "Refresh" button on the left side of the workspace or by selecting the "Refresh" option in the widget menu options. It would be good if the whole workspace could be scheduled to be refreshed periodically the same way the alerts or the accounting engine can be scheduled. This would prevent the user to having to refresh the data manually. Also, it would be good to know the last time the workspace has been refreshed. This would allow the user understand if the data that is showed is consistent. | ||||
Steps To Reproduce | |||||
Proposed Solution | |||||
Additional Information | |||||
Tags | No tags attached. | ||||
Relationships | |||||
Attached Files | |||||
Issue History | |||||
Date Modified | Username | Field | Change | ||
2011-04-19 14:02 | jtarbal | New Issue | |||
2011-04-19 14:02 | jtarbal | Assigned To | => dbaz | ||
2011-04-19 14:02 | jtarbal | Modules | => My Openbravo Tab |
There are no notes attached to this issue. |