Openbravo Issue Tracking System - Openbravo ERP
View Issue Details
0016673Openbravo ERP05. Production managementpublic2011-04-06 18:042011-04-12 13:48
AinhoaPagola 
AinhoaPagola 
normalminorhave not tried
closedfixed 
20Ubuntu 8.4
2.50MP28 
2.50MP31 
Core
No
0016673: Date can be modified in a processed Internal Consuption
After processing an internal consuption, it is possible to change the date.
Go to Production Management || Transactions || Internal Consumption || Header
Create a new header.
Create a line.
Back in the header process it.
Change the date.

Change the date field to read only when the internal consuption is processed.

The data in the lines can not be changed because the trigger does not allow changes if the document is processed. This fields should be changed to read only as well after processing.
No tags attached.
blocks defect 00166713.0RC7 closed AinhoaPagola Date can be modified in a processed Internal Consuption 
Issue History
2011-04-06 18:22AinhoaPagolaTypedefect => backport
2011-04-06 18:22AinhoaPagolafix_in_branch => 2.50
2011-04-07 09:33jonalegriaesarteversion => 2.50MP28
2011-04-07 09:33jonalegriaesarteTarget Versionpi => 2.50MP31
2011-04-11 12:55hgbotCheckin
2011-04-11 12:55hgbotNote Added: 0035813
2011-04-11 12:55hgbotStatusscheduled => resolved
2011-04-11 12:55hgbotResolutionopen => fixed
2011-04-11 12:55hgbotFixed in SCM revision => http://code.openbravo.com/erp/stable/2.50/rev/d4b797f2d6045a9152a7fbe1ec35cacfe66977fa [^]
2011-04-12 12:01AinhoaPagolaNote Added: 0035845
2011-04-12 13:48adrianromeroNote Added: 0035851
2011-04-12 13:48adrianromeroStatusresolved => closed

Notes
(0035813)
hgbot   
2011-04-11 12:55   
Repository: erp/stable/2.50
Changeset: d4b797f2d6045a9152a7fbe1ec35cacfe66977fa
Author: Ainhoa Pagola <ainhoa.pagola <at> openbravo.com>
Date: Mon Apr 11 10:23:42 2011 +0200
URL: http://code.openbravo.com/erp/stable/2.50/rev/d4b797f2d6045a9152a7fbe1ec35cacfe66977fa [^]

Fixes issue 16673. Date in Internal Consuption made read-only after processing

---
M src-db/database/sourcedata/AD_COLUMN.xml
---
(0035845)
AinhoaPagola   
2011-04-12 12:01   
Steps to test:
Go to Production Management || Transactions || Internal Consumption || Header
Create a new header.
Create a line.
Back in the header process it.
Make sure the date in the header can not be changed.

Other areas affected:
None.
(0035851)
adrianromero   
2011-04-12 13:48   
Verified