Openbravo Issue Tracking System - Openbravo ERP |
| View Issue Details |
|
| ID | Project | Category | View Status | Date Submitted | Last Update |
| 0011245 | Openbravo ERP | 06. Material requirement planning (MRP) | public | 2009-11-04 15:06 | 2010-03-17 00:00 |
|
| Reporter | mensenjh | |
| Assigned To | adrianromero | |
| Priority | urgent | Severity | major | Reproducibility | always |
| Status | closed | Resolution | duplicate | |
| Platform | | OS | 20 | OS Version | rPath Linux |
| Product Version | 2.50MP8 | |
| Target Version | | Fixed in Version | | |
| Merge Request Status | |
| Review Assigned To | |
| OBNetwork customer | No |
| Web browser | |
| Modules | Core |
| Support ticket | |
| Regression level | |
| Regression date | |
| Regression introduced in release | |
| Regression introduced by commit | |
| Triggers an Emergency Pack | No |
|
| Summary | 0011245: Cannot process MRP Work Reqs and Material Reqs |
| Description | Work requirements and mateiral requirements in 2.50 MP8 created through the manufacturing plan do not contain an Organization and cannot be processed/completed.
The same scenario was tested in MP5 and MP8 several times. In MP5 everything runs smooth. |
| Steps To Reproduce | * Create a new organization, make it children of Main and set it as ready (with SmallBazaar organizations the issue does not reproduce).
* Follow these steps selecting always your new organization http://wiki.openbravo.com/wiki/How-to_MRP#MRP:_A_second_example [^]
* In Step 12 you will notice that the requisition is created in * organization (instead of your new organization) and you are not able to edit it.
|
| Proposed Solution | |
| Additional Information | |
| Tags | No tags attached. |
| Relationships | | duplicate of | defect | 0012430 | 2.50MP17 | closed | adrianromero | Error launching work requirement and material requisitions from MRP | | related to | defect | 0011227 | | closed | jonalegriaesarte | MRP does not create work req on the basis of min inventory | | has duplicate | defect | 0011266 | | closed | rafaroda | Cannot run any button function in Requisition and Qork Requirement, created from Manufacturing Planning windows |
|
| Attached Files | MRP_WR_MR.odt (132,593) 2009-11-04 15:06 https://issues.openbravo.com/file_download.php?file_id=1913&type=bug |
|
| Issue History |
| Date Modified | Username | Field | Change |
| 2009-11-04 15:06 | mensenjh | New Issue | |
| 2009-11-04 15:06 | mensenjh | Assigned To | => rafaroda |
| 2009-11-04 15:06 | mensenjh | File Added: MRP_WR_MR.odt | |
| 2009-11-04 15:08 | mensenjh | Issue Monitored: mensenjh | |
| 2009-11-05 06:06 | rafaroda | Relationship added | related to 0011227 |
| 2009-11-05 07:42 | rafaroda | OBNetwork customer | => No |
| 2009-11-05 07:42 | rafaroda | Note Added: 0021574 | |
| 2009-11-05 07:42 | rafaroda | Priority | normal => urgent |
| 2009-11-05 07:42 | rafaroda | Severity | critical => major |
| 2009-11-05 07:42 | rafaroda | Status | new => scheduled |
| 2009-11-05 07:42 | rafaroda | Proposed Solution updated | |
| 2009-11-05 07:42 | rafaroda | Steps to Reproduce Updated | |
| 2009-11-05 12:09 | mensenjh | Note Added: 0021598 | |
| 2009-11-05 12:31 | mensenjh | Note Edited: 0021598 | |
| 2009-11-06 08:41 | rafaroda | Relationship added | has duplicate 0011266 |
| 2010-02-11 18:13 | rafaroda | Assigned To | rafaroda => adrianromero |
| 2010-03-16 10:29 | rafaroda | Note Added: 0025528 | |
| 2010-03-16 10:29 | rafaroda | Relationship added | related to 0012430 |
| 2010-03-16 11:09 | mensenjh | Note Added: 0025532 | |
| 2010-03-16 13:05 | adrianromero | Relationship replaced | duplicate of 0012430 |
| 2010-03-16 13:05 | adrianromero | Status | scheduled => closed |
| 2010-03-16 13:05 | adrianromero | Resolution | open => duplicate |
| 2010-03-17 00:00 | anonymous | sf_bug_id | 0 => 2971626 |
|
Notes |
|
|
|
|
|
|
(0021598)
|
|
mensenjh
|
2009-11-05 12:09
(edited on: 2009-11-05 12:31) |
|
I followed instructions according to discussion on http://forge.openbravo.com/plugins/espforum/view.php?group_id=100&forumid=615117&topicid=7000724. [^] This solved the problem for me.
Somehow the login procedure in two different environments did not exactly match, hence that in MP8 I received an error and did not in MP5.
As discussed, this is a workaround. Although the user was for org * all other settings (manufacturing plan not the least) were set to specfic org. WR and MR should not be created for org *.
|
|
|
|
|
Hi,
Is this issue duplicated of issue 0012430? If so, please close this issue as duplicated of 0012430.
Thanks. |
|
|
|
|
|
Hi, this seems to be duplicate indeed. I cannot close the issue. |
|