0010611: RFE: MRP needs to take the Convesion Rate of the Process Plan into account when suggestion Work Requirements
Production Management || Transactions || Process Plan || Process Plan

The process plan for a product contains a Conversion Rate
However, the MRP outcome of the Manufacturing plan doesn't take into account this conversion rate, so in the end the Quantity on the Work requirement might be something like '206.251' (see snapshot).
Setup a process plan with a Conversion rate of 8 for example. Then create demand for the part and run the Manafacturing Plan.
For a more detailed case, please check the Production (openbravo badges) and MRP modules (mfg plan) of the BFT that was provided to Paolo for use within development group.
MRP should take conversion rates of the product into account (or have at least an option to set it up in that way)
No tags attached.
jpg 150909ConversionRate.jpg (186,357) 2009-09-15 13:00
https://issues.openbravo.com/file_download.php?file_id=1754&type=bug
jpg
Issue History
2009-09-15 13:00RenateNieuwkoopNew Issue
2009-09-15 13:00RenateNieuwkoopAssigned To => rafaroda
2009-09-15 13:00RenateNieuwkoopFile Added: 150909ConversionRate.jpg
2009-09-15 13:29rafarodaNote Added: 0020072
2009-09-15 13:29rafarodaStatusnew => feedback
2009-09-18 07:08rafarodaAssigned Torafaroda => pjuvara
2011-02-04 09:11jpabloaeAssigned Topjuvara => rmorley

Notes
(0020072)
rafaroda   
2009-09-15 13:29   
Renate,

These steps to reproduce are not enough. Please take these as an example http://wiki.openbravo.com/wiki/How-to_MRP#MRP:_A_second_example [^]

Thanks.